28 Kasım 2008 Cuma

Volume 4

Date: 28.11.2008

Time: 13:20 - 14:00
Prepared By: Erol Mesut Gün
Participants: Erol Mesut Gün, Çağlar Kara

This was the forth interview with M. T., we talked about general concerns of M. T. about the documents that we have prepared, future composition of our team and general assesment of what we have achieved so far. Main topics are:

  1. 1. Although our weekly meeting is set out at 16:30, for an extreme case on the side of M. T. (Boss), we had to antedate the meeting time to 13:20.
  2. 2. I (Erol Mesut Gün) touched on the future of Lothusa-IT team and we conveyed our concerns about Gülin Sonuç.
  3. 3. M. T. (Boss) shared his opinions about the future composition of our team.
  4. 4. Çağlar Kara (as the Lothusa IT team Project Manager) cited our weekly performance within the bounds of possibilities (no demonstration, in contrast, verbal presentation).
  5. 5. M. T. (Boss) warned us about “on paper prototype drawings” and he added that we have to prepare this document carefully and briefly.
  6. 6. M. T. (Boss) adivced to us to obtain 2 digital books through a friend (Ali Alper İren) to have more insights (about composing prototypes).

Hiç yorum yok: